static path planning 静态路径规划
static traffic planning 静态交通规划
static process planning 离线工艺规划
static reactive planning 静态无功规划
The static planning constructs the mixed integer programming model . A branch exchange technique based on the change base of linear programming solves the model effectively.
静态规划建立了混合整数规划模型, 利用基于线性规划换基运算的支路交换法有效地求解该模型。
Long Range Transmission Planning (LRTP) is composed of two subproblems. the static strategy and dynamic strategy.
输电网中长期规划可分解成单阶段的静态决策和多阶段的动态决策两个子问题。
The kind of virtual simulation provides basis for the verification of dynamic and static interference, path planning, and the parametric design of the grinder.
文中的虚拟仿真与分析也为机床结构设计中的动静态干涉、轨迹规划的合理性及参数设计的合理性评价提供了依据。
应用推荐